- Acceptance criteria
- The observation that settles whether a requirement passed. Without one, "done" is an opinion. 02
- ADR (architecture decision record)
- A short, versioned note recording a decision, its context, the alternatives rejected, and what would reopen it. 03
- Allocation
- Assigning each function to the physical element responsible for it. The mapping is a design decision, not bookkeeping. 03
- Analysis (verification method)
- Proving a requirement by calculation or modeling rather than by running the system. 07
- Architecture
- The expensive-to-reverse structure: major elements, their responsibilities, and how they interact. 03
- Baseline
- A frozen, approved version of requirements, design or code that changes only through change control.
- Blue-green deployment
- Two identical environments; traffic switches between them so a release can be reversed instantly. 09
- Boundary
- The line between what you design and what you design against. A choice, and a common source of expensive mistakes. 01
- Bulkhead
- Isolation of resources so one component or tenant consuming capacity cannot starve the rest. 06
- Canary release
- Sending a small slice of live traffic to a new version, then promoting or rolling back on measured evidence. 09
- Circuit breaker
- Stops calling a dependency after repeated failures, failing fast until a cool-down period passes. 06
- Cohesion
- How strongly the work inside one element belongs together. High cohesion makes change local. 03
- Complicated vs complex
- Complicated is knowable by analysis; complex is only explicable in hindsight and must be probed. 09
- Configuration management
- Knowing exactly what version of what is deployed, and controlling changes to it.
- CONOPS (concept of operations)
- How the system will be used in practice: actors, scenarios, sequence, environment. Often reveals needs the requirements missed.
- Constraint
- A non-negotiable boundary on the solution — law, budget, existing platform, physics. Constraints disqualify options; they don't trade off. 02
- Coupling
- The degree to which one element's changes force changes in another. Loose coupling localises failure and change. 04
- Cynefin
- A sense-making framework that sorts situations into clear, complicated, complex and chaotic, each with a matching response. 09
- Demonstration (verification method)
- Operating the system in front of a witness to show a behavior, without instrumented measurement. 07
- Detection (FMEA)
- How likely you are to catch a failure before the user notices, scored 1 (certain) to 10 (invisible). 06
- Element
- Any part that must exist for the purpose to be met: hardware, software, a person, a procedure. 01
- Emergence
- Behavior produced by interactions rather than by any single part — queueing, cascading failure, culture. 01
- Environment
- Everything outside the boundary that can affect the system or be affected by it.
- Eval gate
- An automated quality threshold a change must pass before being promoted — the model-era version of acceptance testing. 09
- FMEA
- Failure mode and effects analysis: enumerate how each element can fail, score severity, occurrence and detection, mitigate in priority order. 06
- FTA
- Fault tree analysis: work backwards from an undesired top event through AND/OR gates to the combinations of causes that produce it.
- Functional architecture
- What must happen, expressed as functions and flows, with no technology named. 03
- Graceful degradation
- Reducing capability deliberately under failure or load, instead of failing completely. 06
- Guardrail
- An automatic check on input or output that blocks, alters or escalates unsafe content. 09
- Idempotency
- The property that repeating an operation has the same effect as doing it once. The basis of safe retries. 04
- Inspection (verification method)
- Reading or examining an artefact against its specification, without executing it. 07
- Interface
- Everything that crosses a boundary — call, endpoint, message, file, handover — and the contract governing it. 04
- Interface control document (ICD)
- The written contract for one interface: content, format, timing, error behavior, owner, versioning.
- Leverage point
- A place in a system where a small change produces a large effect; Meadows ranks them from parameters up to paradigms. 09
- Lifecycle
- Concept, development, production, utilization, support, retirement — the whole life, not just the build. 08
- Load shedding
- Dropping low-priority work deliberately when overloaded, rather than degrading everything. 06
- MBSE / SysML
- Model-based systems engineering and its modeling language. Powerful at scale; unnecessary for a first one-pager.
- N² matrix
- A grid of system elements against themselves showing which pairs exchange what — the fastest way to find unowned coupling. 04
- Occurrence (FMEA)
- How often a failure cause is present, scored 1 to 10 from measured history.
- Physical architecture
- The real elements that will perform the functions: services, databases, devices, people. 03
- Pugh matrix
- A trade-study table scoring alternatives relative to a baseline as better, same or worse, weighted by criteria. 05
- Reliability
- How often the system works as specified. A prevention question. 06
- Requirement
- A statement of behavior or constraint the system must satisfy that can be verified. Uses "shall". 02
- Resilience
- The ability to absorb, adapt and recover from disturbance. A recovery question, not a prevention one. 06
- Risk
- A claim about consequence and likelihood, written down so it can be compared and mitigated. 06
- RPN
- Risk priority number: severity × occurrence × detection in FMEA, 1–1000. A sorting device, not a verdict. 06
- Sensitivity analysis
- Re-running a decision with different weights to check whether the conclusion survives. 05
- Severity (FMEA)
- How bad the consequence is, 1 to 10. 9–10 (safety, data loss, legal exposure) overrides the arithmetic. 06
- Shall / should / may
- Mandatory / preferred / optional. Precision here decides contract disputes.
- Single point of failure
- Anything whose loss stops the system — including people, keys, DNS and that one spreadsheet. 06
- SLO / SLI
- An objective (e.g. 99.9% availability) measured by an indicator (successful requests ÷ total).
- Stakeholder
- Anyone who affects or is affected by the system: users, operators, sponsors, regulators, maintainers.
- Stakeholder need
- An outcome a stakeholder wants, in their own language, before any solution is chosen. 02
- System
- A combination of interacting elements organized to achieve one or more stated purposes (ISO/IEC/IEEE 15288). 01
- Technical debt
- A decision that moved cost from development into support without a plan to repay it. 08
- Test (verification method)
- Execution under controlled conditions with measured results — the method for anything with a number. 07
- Traceability
- The link from need to requirement to design to evidence. Without it, change impact is guesswork. 07
- Trade study
- A structured comparison of alternatives against weighted criteria, documented with rationale. 05
- Validation
- Did we build the right thing — does it satisfy the need in real use? 07
- Verification
- Did we build it right — does it conform to the specified requirements? 07
- V-model
- A diagram pairing each decomposition level on the way down with its verification level on the way up. 07
- 15288
- ISO/IEC/IEEE 15288: the international standard describing system life-cycle processes. A menu to tailor, not a mandate. 08